G.E.E.F auxiliary building
Posted on: 18/02/2014
Following the completion of the erection of the three-storey steel frame of the new G.E.E.F auxiliary building of 100tn weight, the cladding works are about to commence next week using sandwich wall panels filled with polyurethane foam. Works will be completed with the construction of the steel stair shafts and railings of the building.