CRYSTAL SPRINGS BEACH HOTEL

Posted on: 12/03/2015

Within the coming week the erection works of the new floor addition to the Crystal Spring Beach Hotel in Protaras will be completed. The steel structure has a weight of 65tn and covers an area of 950 sq.m., it is erected on the existing 5th floor of the building, while for the roof envelop the pioneer SpeedZip® Standing Seam Roofing System will be installed.