G.S.O. CROSSING FOOTBRIDGE

Posted on: 18/06/2013

The erection works of the imposing 25m long steel footbridge have completed at the area of the old G.S.O, over the promenade in Limassol. The lifting and installation procedure of the structure was particularly impressive, and it was performed in the early hours of Sunday in order to restrict the traffic on the busy avenue.